• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer
Park Power Logo

Park Power

Your Friendly, Local Utilities Provider

  • About
    • Why Park Power
    • How to Switch
      • How to Switch Electricity
      • How to Switch Natural Gas
      • How To Switch Your Cable Internet
      • How To Switch Your DSL Internet
    • Community Partners
    • Reviews
    • Blog
  • Compare Rates
    • Compare Electricity Rates
      • Compare Residential Electricity Rates
      • Compare Commercial Electricity Rates
      • Compare Farm Electricity Rates
      • Compare Solar Electricity Rates
      • Compare Electricity Green Power Program
    • Compare Natural Gas Rates
      • Compare Residential Natural Gas Rates
      • Compare Commercial Natural Gas Rates
      • Compare Farm Natural Gas Rates
    • Compare Internet Rates
      • Compare Cable Internet Rates
      • Compare DSL Internet Rates
    • Utility bundles
  • FAQ
  • Contact
  • Login
  • Sign Up
You are here: Home / Consumer Info / What happened April 5, 2024 to Alberta’s Electricity System?

What happened April 5, 2024 to Alberta’s Electricity System?

parkpower · 9 April 2024 · 1 Comment Consumer Info, Electricity

Many Albertans are questioning what is happening to Alberta’s electricity system after the few grid emergencies we have experienced over the past few months.

Below is an excellent recap of the situation in Alberta by Jason Doering of oHmland. Jason’s Substack has some great info about the Alberta Electricity Market and you should consider subscribing.

“The Alberta Electric System Operator (AESO) held a media briefing on Apr 5th to explain the supply shortfall event that took place that morning.  There are many media articles and pundits interpreting the event (including me :)), but I urge anyone who wants to understand what really happened to listen to the webinar the AESO has posted on its website.  Here is a link: AESO Media Briefing on Apr 5th Event

We should all be grateful to the AESO’s System Controllers for the work they did on Apr 5th and every day of the year to keep the electrons flowing.  They are trying to manage a very fragile system and are faced with numerous challenges every week that are making their jobs increasingly difficult and stressful, so we owe them a debt of gratitude.

My summary of the facts – but please also listen to the AESO’s explanation:

  • many generators were on planned maintenance outages, which is normal during the spring season in Alberta when our demand is low
  • some dispatchable capacity was offline because they were uneconomic due to low pool prices over the preceding days, which is also normal in our market design
  • wind generation forecast error (lower than forecast) combined with an approximately 400 MW thermal unit trip during the morning load ramp resulted in an Energy Emergency Alert 3 at 6:49 AM on Apr 5, 2024
  • the AESO directed all operating reserves to provide energy, all available dispatchable generators to provide as much energy as possible, and tried to get as much energy from the interties as possible
  • this was insufficient to meet demand, so the AESO directed the transmission and distribution system operators to perform controlled load shedding of about 250 MW for about 20 minutes to rebalance supply and demand until the system was stabilized

My observations, but please also listen to the AESO’s explanation to draw your own conclusions:

  • the Jan 13, Apr 3, and Apr 5 events were all supply adequacy problems.  A power system with sufficient dispatchable generation capacity in reserve (reserve margin) should be able to handle forecast errors, planned outages, and generation and transmission contingencies (aka “trips”).  The Alberta system has insufficient reserve margin due to many years of policy/social preference for renewables over thermal generation and we are now experiencing the effects of over-investment in renewables and under-investment in dispatchables.
  • this is not the AESO’s fault, it is the outcome of a market and policy framework designed for a different context in which economics alone were relied upon to provide resource adequacy.  The AESO is doing the best it can to manage the system within their legislated authourities, which do not include resource adequacy.  Blaming and shaming is a waste of time – the solution is policy and market design change and we should use this as motivation to address these.
  • this problem is not unique to Alberta, it is happening in all jurisdictions to varying degrees.  The difference in Alberta is that we are essentially an electrical island with very little intertie capacity, so our resource adequacy problems and our over-exposure to weather-dependent resources are very visible because we cannot mask them with energy from interties to compensate for our problems, like other jurisdictions can.  We have nowhere to hide.
  • this was a resource adequacy problem, not a reliability problem.  I hear the media calling this a reliability issue, but it was not, and the difference is important because it determines the solutions we need.  I’ve provided the NERC definitions of adequacy and reliability below – the language we use matters.

Adequacy – the ability of the electric system to supply the aggregate electrical demand and energy requirements of the end-use customers at all times, taking into account scheduled and reasonably expected unscheduled outages of system elements.

Reliable Operation – operating the elements of the Bulk-Power System within equipment and electric system thermal, voltage, and stability limits so that instability, uncontrolled separation, or cascading failures of such system will not occur as a result of a sudden disturbance, including a cybersecurity incident, or unanticipated failure of system elements.

Pictures tell better stories than words, so here is the situation the AESO was dealing with on Apr 5th. The maroon “Capacity Available for Dispatch” line tells the resource adequacy story…

Source – AESO Daily Market Report Apr 5 2024

Final Thoughts

The solution for our power system problems in Alberta is market and transmission policy change, not blame and recrimination. The Alberta government is already moving down this path in collaboration with the power system agencies and industry and I hope this event provides the motivation to expedite those efforts.”

Again, if you found this information useful, check out oHmland and throw some $$$ his way.

Reader Interactions

Comments

  1. Martin Maruta says

    25 May 2024 at 6:58 pm

    noted keep updating awesome work

    thanks

    Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Primary Sidebar

Recent Posts

  • Your Guide to Alberta Electricity Bills: RRO vs ROLR
  • Understanding the Rate of Last Resort (ROLR) in Alberta
  • What happened April 5, 2024 to Alberta’s Electricity System?
  • Alberta’s Natural Gas Rebate Program
  • Government of Alberta Electricity Rebate Program

Recent Comments

  • parkpower on Cheapest Fixed Electricity & Natural Gas Rates In Alberta
  • Fran on Cheapest Fixed Electricity & Natural Gas Rates In Alberta
  • Paul on A Closer Look at Direct Energy
  • parkpower on Cheapest Fixed Electricity & Natural Gas Rates In Alberta
  • Jessica Monica Grohs on Cheapest Fixed Electricity & Natural Gas Rates In Alberta

Archives

  • January 2025
  • October 2024
  • April 2024
  • January 2023
  • July 2022
  • October 2021
  • September 2021
  • February 2021
  • January 2021
  • December 2020
  • November 2020
  • July 2020
  • May 2020
  • April 2020
  • March 2020
  • January 2020
  • December 2019
  • November 2019
  • August 2019
  • July 2019
  • June 2019
  • March 2019
  • February 2019
  • January 2019
  • November 2018
  • October 2018
  • May 2018
  • March 2018
  • February 2018
  • December 2017
  • October 2017
  • May 2017
  • December 2016
  • November 2016
  • October 2016
  • September 2016
  • May 2016
  • April 2016
  • March 2016
  • February 2016
  • January 2016
  • December 2015
  • November 2015
  • October 2015
  • September 2015
  • August 2015
  • July 2015
  • May 2015
  • April 2015
  • February 2015
  • January 2015
  • December 2014
  • November 2014
  • October 2014
  • September 2014
  • August 2014
  • July 2014
  • June 2014
  • May 2014
  • April 2014
  • March 2014
  • February 2014
  • January 2014
  • December 2013
  • November 2013
  • October 2013

Categories

  • Community Building
  • Consumer Info
  • Electricity
  • Interesting
  • Natural Gas
  • Solar Power
  • Uncategorized

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org

Footer

Contact Park Power

Customer Support
780-640-2128

customercare@parkpower.ca

General Inquires

info@parkpower.ca 

Community Partnerships

community@parkpower.ca 

Park Power

#454, 314 – 222 Baseline Road Sherwood Park AB 
T8H 1S8

Social Media

  • Facebook
  • Instagram
  • LinkedIn
  • Twitter

Accreditations

Edmonton Made Logo - Accreditations for Park Power

Privacy & Legal

Park Power is an energy marketer for UtilityNET (Utility Network & Partners Inc.). Park Power operates under UtilityNET’s Electricity and Natural Gas Marketing Business License issued by Service Alberta, a Ministry of the Government of Alberta. You are free to purchase electricity and natural gas from the provider of your choice. The delivery of natural gas and electricity to you is not affected by your choice. If you change who you purchase natural gas or electricity from, you still receive natural gas and electricity via the distribution company in your service area. For a list of energy providers you may choose from, visit ucahelps.gov.ab.ca or call 310-4822 (toll-free in Alberta). Some offers, in whole or in part, may not be available in natural gas co-ops, municipally owned utilities, and some rural electrification associations. Copyright © 2025 Park Power Ltd.